FPB 64 Progress Report 9
FPB Series

FPB Series

Videos & Slide Shows

Recent Press

An Introduction to the FPB Program

Paradigm Shift
Why Are We Doing This?
Speed
360-Degree Views
A Different Perspective
Our Own Time Machine
Weathering the Storm

Design Objectives

Heavy Wx Issues
Directional Control
Stability,Comfort, Capsize Resistance
Hull Shape & Pitching
Hull & Deck Structure
Painted or Bare Aluminum?
Hull Maintenance
Glazing
Comfort

FPB 64 - Reality

FPB 64 Intro
2nd Series Changes & Options
On Deck
Awnings
Aft Deck
Interior
Storage
Hull Shape
Forepeak
Engine Room
Jury Rig
Systems
Tankage
Range
Structure
Factors of Safety
The Team
FAQs
The Next Step
Latest Progress
FPB 64 Notes

FPB 83

FPB 83 On Deck

Flying Bridge
Tropical Considerations
Working on Deck
Jury Rig

Roll Control
Swim Step

FPB 83 Interior

Interior Layout
Galley
Saloon
Staterooms
Nav Station/Bridge
Ship's Office
Laundry Facilities

FPB 83 Systems

Drive Line
Electrical Systems
Refrigeration
Heating/Hot Water
Motion Control
Air Conditioning
Domestic Water

FPB 115

Dashew Offshore

A Different Approach
Design Milestones
Details
Beowulf Series
Contact Us

Dashew Logs

 

Stay up to date on SetSail & Dashew Offshore!
Email:  

FPB 64 Progress Report #9

(For the latest progress reports after #9, click here.)

Lots more to share this week, starting with the hydraulic system pulsation dampener (the pipe shaped device mounted on top of the hydraulic pump). We use these to reduce hydraulic noise.

A water separator for the genset exhaust. Note the lovely bent and welded aluminum bracket. You will see these throughout the boat.

Preliminary layout for fresh water pressure pumps and accumulator tank. We are fitting two pressure pumps, one for each tank. This makes it easy to decide which tank to use (no valves, just a selector switch) and the second pump is a built in back up. In laying out all of this gear the primary requirement is easy of maintenance. And if you run a tank dry the second pump is primed and ready to go (especially important if you are taking a lovely long shower on a cold night).

There are individual pumps for each air conditioning compressor. This increase reliability (if you lose a pump only that compressor is affected) and uses less power.

This nondescript photo is of the hydraulic oil cooling tank. Rather than heat exchangers and complex plumbing for cooling water we are using a simple hull tank for cooling the hydraulic oil.

Preliminary layout for alternator rectifier assemblies. These are remotely mounted, away from the alternator casings, to better distribute the heat build up. The output of the alternators is fused after the rectifier assembly.

Basic assembly of high load DC system.

A junction box for electrical connections to the forward mast in the forepeak.

And the junction box and connection points for shorepower. It is protected from drips by the step above it.

Hull number one is now being insulated with Armaflex. Note that the topsides, deck, and stiffeners are being covered. This photo is of the area outboard of the forward shower compartment. The three pipes shown are conduits for wiring.

Looking at the fuel tank area on hull number two. The aft center tanks are now closed off. The rest will soon have their tops welded.

Finally some shots showing the roof going onto the saloon of hull number two. This has been prefabricated on a building jig in another section of the shop.

The complete assembly is lifted off the dolly and onto the waiting window mullions

As we have discussed previously, these mullions are welded at the coaming top, deck, and to the first topside stronger. The creates an enormously strong bond beam.

The roof assembly being guided into place.

Ah, it fits...Time to start welding.